Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Al-Bayati, A J, Al-Kasasbeh, M, Awolusi, I, Abudayyeh, O and Umar, T (2021) Trends of Occupational Fatal and Nonfatal Injuries in Electrical and Mechanical Specialty Contracting Sectors: Necessity for a Learning Investigation System. Journal of Construction Engineering and Management, 147(07).

Ali, G M, Olearczyk, J, Bouferguene, A and Al-Hussein, M (2021) Implementation of Combined Loading to Calculate Ground Bearing Pressure under Crawler Crane Tracks. Journal of Construction Engineering and Management, 147(07).

AlOtaibi, M, El-Rayes, K and Altuwaim, A (2021) Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost. Journal of Construction Engineering and Management, 147(07).

Altuwaim, A and El-Rayes, K (2021) Multiobjective Optimization Model for Planning Repetitive Construction Projects. Journal of Construction Engineering and Management, 147(07).

Amer, F, Koh, H Y and Golparvar-Fard, M (2021) Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research. Journal of Construction Engineering and Management, 147(07).

Benachio, G L F, Freitas, M d C D and Tavares, S F (2021) Interactions between Lean Construction Principles and Circular Economy Practices for the Construction Industry. Journal of Construction Engineering and Management, 147(07).

Bhih, M and Hegazy, T (2021) Enhanced But-For Method to Apportion Net Delays and Accelerations. Journal of Construction Engineering and Management, 147(07).

Brito, D M d, Ferreira, E d A M and Costa, D B (2021) Framework for Building Information Modeling Adoption Based on Critical Success Factors from Brazilian Public Organizations. Journal of Construction Engineering and Management, 147(07).

Cai, J, Yang, L, Zhang, Y, Li, S and Cai, H (2021) Multitask Learning Method for Detecting the Visual Focus of Attention of Construction Workers. Journal of Construction Engineering and Management, 147(07).

Eissa, R, Eid, M S and Elbeltagi, E (2021) Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(07).

Fan, S, Yeh, I and Chi, W (2021) Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis. Journal of Construction Engineering and Management, 147(07).

Gaikwad, S V, Calahorra-Jimenez, M, Molenaar, K R and Torres-Machi, C (2021) Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. Journal of Construction Engineering and Management, 147(07).

Imam, H (2021) Roles of Shared Leadership, Autonomy, and Knowledge Sharing in Construction Project Success. Journal of Construction Engineering and Management, 147(07).

Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(07), 05021005.

Lee, C and Chong, H (2021) Influence of Prior Ties on Trust and Contract Functions for BIM-Enabled EPC Megaproject Performance. Journal of Construction Engineering and Management, 147(07).

Lee, J (2021) Life Cycle Costing for Exterior Materials on Building Façade. Journal of Construction Engineering and Management, 147(07).

Lin, J J and Golparvar-Fard, M (2021) Visual and Virtual Production Management System for Proactive Project Controls. Journal of Construction Engineering and Management, 147(07).

Liu, H, Kwigizile, V and Huang, W (2021) Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items. Journal of Construction Engineering and Management, 147(07).

Mathew, S A, Tran, D Q and Nguyen, P H D (2021) Evaluation of Cost Growth Factors in Design-Build Highway Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 147(07).

Melhem, N N, Maher, R A and Sundermeier, M (2021) Waste-Based Management of Steel Reinforcement Cutting in Construction Projects. Journal of Construction Engineering and Management, 147(07).

Milošević, I, Kovačević, M and Petronijević, P (2021) Estimating Residual Value of Heavy Construction Equipment Using Ensemble Learning. Journal of Construction Engineering and Management, 147(07).

Musenero, L, Baroudi, B and Gunawan, I (2021) Application of Dual Concern Theory in Elucidating Conflict Behavior in Infrastructure Public-Private Partnership Projects. Journal of Construction Engineering and Management, 147(07).

Okpala, I, Nnaji, C, Awolusi, I and Akanmu, A (2021) Developing a Success Model for Assessing the Impact of Wearable Sensing Devices in the Construction Industry. Journal of Construction Engineering and Management, 147(07).

  • Type: Journal Article
  • Keywords: Construction safety monitoring; Safety performance; Wearable technology; Construction technology; Safety management; Success model;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002064
  • Abstract:
    In a bid to optimize jobsite safety, wearable sensing devices (WSDs) are slowly emerging as a class of viable tools with strong potential to improve safety measurement and monitoring. While some industries have successfully utilized WSDs, such as smart personal protective equipment (PPE), to track data related to health, fitness, or even location, the construction industry has been relatively slow in implementing WSDs. Although some progress is expected, construction management research is yet to provide clear evidence of the impact of WSDs on vital project and organizational performance metrics such as safety and productivity. To fill this gap, the present study established the first WSD success model using multiple complementary frameworks and theories. The success model comprises individual adoption factors that influence individual WSD use and highlights implementation success indicators needed to evaluate adoption success. It was tested using survey questionnaires retrieved from 415 users of WSDs in the United States. Test results indicate the success model was a good fit. Moreover, findings suggest a strong positive relationship between the use of WSDs and individual performance, and project performance. This hybrid model provided critical insights on the impact of WSDs on workers’ performance, project metrics, as well as essential information for supporting the increased adoption of WSDs. It is believed that this framework will also guide construction practitioners in the effective integration of WSDs into their work processes.

Rausch, C, Sanchez, B and Haas, C (2021) . Journal of Construction Engineering and Management, 147(07).

Serugga, J, Kagioglou, M and Tzortzopoulos, P (2021) Benefits Realization: Novel Conceptual Model for Front End–Design Decision-Making Using Dempster–Shafer Theory and Quality Function Deployment. Journal of Construction Engineering and Management, 147(07).

Shen, W, Tang, W, Wang, Y, Duffield, C F, Hui, F K P and Zhang, L (2021) Managing Interfaces in Large-Scale Projects: The Roles of Formal Governance and Partnering. Journal of Construction Engineering and Management, 147(07).

Wang, S, Zhu, S and Yuen, P (2021) Assessment of Ground-Borne Vibration Impact on Nearby Underground Facilities Induced by Ground Surface Excavation. Journal of Construction Engineering and Management, 147(07).

Welfare, K, Sherratt, F and Hallowell, M (2021) Perceptions of Construction Work: Views to Consider to Improve Employee Recruitment and Retention. Journal of Construction Engineering and Management, 147(07).

Wu, X and Xu, F (2021) Detection Model for Unbalanced Bidding in Railway Construction Projects: Considering the Risk of Quantity Variation. Journal of Construction Engineering and Management, 147(07).

Zhang, X, Yu, Y, He, W and Chen, Y (2021) Bidding Decision-Support Model for Construction Projects Based on Projection Pursuit Learning Method. Journal of Construction Engineering and Management, 147(07).